Saturday, December 21, 2019

PHMSA Extends Comment Period on LNG by Rail NPRM


The DOT’s Pipeline and Hazardous Material Safety Administration (PHMSA) published a notice in Monday’s (available online today) Federal Register (84 FR 70491-70492) announcing that they were extending the deadline for comments on their Liquified Natural Gas by Rail NPRM. The additional time was added because PHMSA published their LNG by Rail Special Permit and included the operational controls specified in that document as potential controls in the NPRM. The new closing date for comments is January 13th, 2020.

No comments:

 
/* Use this with templates/template-twocol.html */