Last month Sen Luján introduced S 2508, the Gas Pipeline Leak Detection and Repair Act of 2025. The bill would provide an effective date for the “the final rule of the Pipeline and Hazardous Materials Safety Administration issued under section 60102(q) of title 49, United States Code, on January 17, 2025, relating to “Pipeline Safety: Gas Pipeline Leak Detection and Repair” (Docket No. PHMSA–2021–0039; RIN 2137–AF51) [link added]”. No new funding is authorized.
This bill is a companion bill (identical language) to HR 4818 that was introduced on the same day in the House.